Why a Moulded Plastic Part Fails Inspection on Day One but Passes on Day Three

It happens on almost every new tool. The first-off samples come out of the press, still warm, and go straight to the CMM because everyone wants an answer before the end of the shift. A bore is 0.2 mm out and a flange is bowed. By the afternoon there’s talk of putting the tool back in the toolroom.

Two days later somebody measures the same parts again, and most of the problems have gone. Nothing changed in the steel. The plastic just finished moving.

I’ve seen a lot of tool rework ordered on numbers taken too early, on the wrong datums, or with a fixture that told a kinder story than the assembly would. Cutting steel is slow and expensive, and steel you remove can’t easily be put back. So it’s worth the toolroom and the quality team agreeing how first samples get measured before they arrive.

Plastic Keeps Moving After It Leaves The Mould

Everyone knows plastic shrinks as it cools. What catches people out is how long it keeps going. Most of the shrinkage happens in the tool and in the first hour or so, but a part can carry on settling for a day or more as it cools fully and the stresses frozen in during moulding relax.

How much depends on the material. Amorphous plastics like ABS and polycarbonate shrink relatively little, typically somewhere around 0.4 to 0.7 percent, and they settle quickly. Semi-crystalline materials like polypropylene, acetal and nylon shrink a lot more, often 1.5 to 2.5 percent for polypropylene, and they keep crystallising after ejection. That’s the group where a part measured warm can look quite different the next day.

Nylon adds a second twist. Fresh off the press it’s dry, and it then soaks up moisture from the air, which makes it grow again. A glass-filled PA66 bracket can measure one size on day one and creep towards another over the following weeks as it comes into balance with the room. If the drawing doesn’t say whether the dimensions apply dry as moulded or conditioned, you can argue about it forever.

The standard test methods for mould shrinkage don’t measure straight away either. They condition the samples first. A first article inspection should do the same thing.

A Simple Rule For Conditioning

For most jobs we work to something like this. Leave amorphous parts at least a few hours, ideally overnight, at normal room temperature before measuring anything critical. Leave semi-crystalline parts 24 to 48 hours. For nylon, agree up front whether you are measuring dry as moulded or conditioned, write it on the drawing, and keep the parts in sealed bags if you need them dry.

It also pays to label the samples with the shot number and the time they were moulded. The first few shots from a cold tool won’t match shots from a tool that has been running for an hour, so measuring shot three tells you very little about production.

Datums On A Part That Isn’t Quite Flat

Most moulded parts have some warp, even good ones. A lid might rock by a few tenths of a millimetre on a surface plate. That isn’t always a problem, because in service it gets screwed down to something stiffer and pulled flat.

The trouble starts when the datum scheme assumes a rigid part. Pick three points on a bowed face as your primary datum and every other feature is measured relative to a plane that only exists on that one part. Move the probe points slightly and the results change. We’ve seen two CMM programmes on the same part disagree by more than the tolerance band, purely because of where they touched down.

Better options are datums on features that are stiff and close to where the part locates in the assembly, such as bosses, location pins or a rib intersection, rather than the middle of a big flat face. If the part is meant to be clamped flat in use, say so on the drawing and measure it restrained.

When The Fixture Fixes The Part

The other side of that is a fixture which holds the part too well. A heavy clamp pulls a warped side wall straight, the CMM reports a perfect profile, everyone signs it off, and the part then won’t clip into the mating housing because in free state it’s bent.

A useful habit is to measure key features twice, once restrained in the way the assembly will hold it and once free. If the two results are close, you’re fine. If they’re far apart, you’ve learned something about the part that no single report would have told you.

Flow Direction Changes The Answer

Plastic doesn’t shrink the same in every direction. Molecules, and in filled grades the glass fibres, line up with the flow from the gate. With glass-filled materials, shrinkage along the flow can be less than half of what it is across it. Unfilled semi-crystalline grades also show a difference, just a smaller one.

That has two consequences for inspection. First, a round boss can come out slightly oval, and the orientation of the oval tells you where the gate is. Second, the same nominal dimension can be fine in one direction and out in the other. Before you probe, look at the gate position and the flow pattern from the mould flow study if there was one, and expect the long dimension running along the flow to behave differently from the one across it.

This is also why a tool built with a uniform shrinkage allowance can be right for some features and wrong for others. The fix is usually a targeted adjustment to a few features, not a recut of the whole cavity.

A First Article Routine Everyone Can Agree On

None of this is complicated, but it works far better when it’s agreed before the samples land rather than argued about afterwards. A short routine might look like this:

  • Agree the conditioning time for the material, and whether nylon is measured dry or conditioned.
  • Take samples once the process is stable, not from the first shots, and label them with shot number and time.
  • Agree the datum scheme and the fixture with the toolroom, and note which features are measured restrained and which free.
  • Mark the gate position and flow direction on the inspection drawing.
  • Measure several cavities and several shots, not one part, so you can see process variation as well as tool error.
  • Only then decide whether a feature needs steel off, steel on, or a process change.

That last point matters. A dimension that is slightly out can often be brought in with a change to pack pressure, hold time or mould temperature. It’s quicker and cheaper than toolwork, and it’s reversible. Steel-safe tools, where critical features are deliberately left with metal to remove, make the remaining corrections straightforward.

For anyone buying injection moulding for the first time, it’s worth asking your moulder how they measure first-off parts and how long they wait. A good answer will mention conditioning, datums and flow direction. If the answer is that the parts go straight on the CMM, it’s worth having this conversation before anyone touches the tool.

Author: Richard Pike, Managing Director of Gemini Manufacturing & Prototyping, a UK plastics manufacturer. The company runs injection moulding, blow moulding and liquid silicone rubber moulding in-house, and makes mould tools in its own toolroom.